Echelon i.LON SmartServer 2.0 Power Line Manuel d'utilisateur Page 105

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 144
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 104
i.LON SmartServer 2.0 Power Line Repeating Network Management Guide 91
10. Click OK to add the exception and return to the Scheduler: Exception Schedules Web page
(click Cancel to discard all changes and return to the Scheduler: Exception Schedules Web
page). The range of dates on which the exception is to occur is highlighted light blue in the
calendar and outlined with a color differentiating it from the other exceptions in the calendar.
11. Click Submit.
Creating Exception Events
This section generally describes how to create events in an exception schedule. The subsequent
section, Demonstrating a Street Lighting Schedule, includes the specific events you can create for
scheduling a street lighting network.
To create events in an exception schedule, follow these steps:
1. From the Scheduler: Exception Schedules Web page, click one of the light blue-highlighted
dates in the calendar to create the recurring exception schedule for the range of dates specified in
the previous section. The Edit: <exception start date> dialog opens.
Vue de la page 104
1 2 ... 100 101 102 103 104 105 106 107 108 109 110 ... 143 144

Commentaires sur ces manuels

Pas de commentaire