Echelon IzoT NodeBuilder Manuel d'utilisateur Page 66

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 291
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 65
11. Click Add Watch. The variable is added to the Watch List pane at the bottom of the NodeBuilder
Project Manager. This pane displays each of the variables added to the watch list and their current
values.
12. Click the Step Into button (
) in the debug toolbar to step through the code in the function until
you reach the end of the when clause. The input_value variable is 0.
13. Click the Step Into button to observe that the function executes a second time. The
input_value variable is now 1.
14. Click the Resume button (
) in the debug toolbar. Your device application resumes normal
execution.
15. Click Debug, point to Stop Debugging, and then select All Devices.
52 Creating and Opening IzoT NodeBuilder Projects
Vue de la page 65
1 2 ... 61 62 63 64 65 66 67 68 69 70 71 ... 290 291

Commentaires sur ces manuels

Pas de commentaire